Askari 10 — 2 Kanal House
Installation Challenge
Maintaining consistent alignment and finish quality across a large two-kanal residence while coordinating with active house construction. The hallway features a 45-degree diagonal field tile grid framed by border tiles and metallic inlays that must remain square to walls and column piers, alongside multi-material master bathroom tiling.
ArcheTiles Engineering Solution
Work is being completed in planned stages. For the corridor flooring, center-lines and border datums were laser-aligned to ensure symmetrical diagonal cuts at perimeter borders, joints were set flush, and classical stone skirting was hand-mitred around column bases. In the bathroom, every joint is held by levelling clips while the adhesive cures.
Site Engineering Details
Final specifications and the project passport will be recorded after completion and handover.
We offer visit to our clients — you can visit our sites which are in progress in F-6, F-7, and across Islamabad to inspect our craftsmanship firsthand.
Project Media & Execution Gallery
Explore authentic site photos and video recordings from this project installation.
Live On-Site Video Footage (3)
Installation Photographs (15)














