Back to Selected Surfaces
E-11, Islamabad — Front Elevation
Tile FormatBig Tiles
MaterialBig Tiles
PropertyFront Elevation
Project StatusOngoing
Installation Challenge
Creating a clean and balanced front elevation while keeping the tile lines consistent across exterior openings and architectural details.
ArcheTiles Engineering Solution
The elevation is being set out in measured sections so the big tiles remain aligned and the facade details finish cleanly.
Technical Specification Ledger
Site Engineering Details
Adhesive & Mortar SystemExterior fixing system selected for the site conditions
Sub-floor PreparationOngoing facade preparation and alignment checks
Layout Grid StrategyMeasured elevation grid with controlled joints and edge alignment
Execution DurationOngoing
Work Currently Underway
Final specifications and the project passport will be recorded after completion and handover.
We offer visit to our clients — you can visit our sites which are in progress in F-6, F-7, and across Islamabad to inspect our craftsmanship firsthand.
On-Site Visual Evidence
Project Media & Execution Gallery
Explore authentic site photos and video recordings from this project installation.